The Black Hat | Shildon Engineering 2014

Created 10-Jan-14
Modified 10-Jan-14
Visitors 37
31 photos
Here photos show the engineering trains moving to start the engineering work between Shildon and Newton Aycliffe. Traction caused quite a stir, being supplied from DRS, seeing no less than four class 20s rostered for the work alongside two class 57s.

The trains were seen entering the possession site at Heighington before then running to Shildon and the worksite which was to replace around 600 yards of track on the upline each night.

Categories & Keywords
Category:
Subcategory:
Subcategory Detail:
Keywords: